The inner bar dredging project of Mongla Sea Port has resumed aiming at increasing the port’s capacity to ensure smooth arrival of ships with a draft of 9.5 meters to 10 meters at the port jetty. The dredging of section-2 and -4 of the bay’s creek area of the port began