Due to the ongoing global dollar and energy crises, power production at several power plants in Bangladesh has been interrupted. As a result, heavy load-shedding is occurring nationwide. The regular lives of the people have been greatly hampered due to the frequent power outages. However, S. Alam Group’s SS Power